Schofields Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Defect Investigation Reports in Schofields

One element that has failed, set against what was actually required of it.

  • One element examined closely
  • Measured against the engineering
  • Cause stated, not implied
  • Ownership boundary established
  • Photographed in sequence
  • Suitable for a dispute file
  • Engineer referral where needed
  • Two to four business days
Price your Schofields inspectionTell us the address and what you need.

Fully licensed & accredited

What is included

What is included in a Schofields defect investigation report

A defect investigation is measured against the approved drawings and engineering for the property, the National Construction Code, the Guide to Standards and Tolerances 2017 and the Australian Standard governing the element in question.

0 checkpoints across 0 areas on a standard Schofields defect investigation report. On attached housing we need to know what is yours and what is common property before we attend, because it decides what the report can cover.

Sample findings

How we put a Schofields investigation together

No defect grid appears here; the explanation is above.

The Owner Inspections inspection team
Why Schofields owners choose us

Independent. Licensed. Insured.

  • [object Object]
  • [object Object]
  • [object Object]
  • [object Object]
Guides

Defect Investigation Reports guides for Schofields

All guides →

Book defect investigation reports in Schofields

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Defect Investigation Reports in Schofields: common questions

Why no photographs?

We have not carried out a defect investigation in Schofields. The page stays as text rather than borrowing findings from elsewhere and inviting you to read them as local.

Who do I pursue on a townhouse?

That depends on whether the element is inside your lot or on common property, which the investigation establishes before anything else.

Will NCAT accept the report?

It is written to be usable, though the tribunal wants a report drawn to NCAT Procedural Direction 3, which we prepare as its own document.

CallGet a Free Quote