Cladding sitting too close to the concrete
A clearance is a barrier and an inspection zone at once.
In short: Ground clearance shortfalls recorded three times on one Schofields property.
What the clearance is for
Keeping cladding out of ground moisture, and leaving a visible band where termite activity would have to show itself.
What we recorded
Cladding to ground clearance below the required minimum, three separate times on the same Schofields property.
How it usually happens
Concrete, paving or landscaping added after the house was built, raising the level against a wall that was set correctly at the time.
The two consequences
Moisture wicking into the wall, and the loss of the zone a pest inspector relies on.
The remedy
Cutting the level back, which is landscaping work rather than building work.
Written by the Owner Inspections team from inspections carried out in Schofields. Licensed building practitioners, NSW Fair Trading licence 366177C.